Difference between revisions of "Private:progress-magdy"

From NMSL
m
Line 6: Line 6:
  
  
=== Feb 20 ===
+
=== March 13 ===
*
+
*We arrived in Canada on 3rd, March and it took us about a week to settle in, thanks God.
*
+
*We started our work full load on 11th, March. We had two remaining things to do; first, to implement the smooth handover part of the fault tolerance algorithm. We have done it. Second, to fine tune the settling time of the system with the delay compensator. We have done as much as we can in this, but still the settling time is longer than that in the transaction paper.
 
 
 
 
=== Feb 13 ===
 
*
 
*
 

Revision as of 18:53, 15 March 2015

Spring 2015 (Intern)

  • Courses: None
  • Submissions: None


March 13

  • We arrived in Canada on 3rd, March and it took us about a week to settle in, thanks God.
  • We started our work full load on 11th, March. We had two remaining things to do; first, to implement the smooth handover part of the fault tolerance algorithm. We have done it. Second, to fine tune the settling time of the system with the delay compensator. We have done as much as we can in this, but still the settling time is longer than that in the transaction paper.