Difference between revisions of "Private:progress-magdy"

From NMSL
Line 9: Line 9:
 
*We arrived in Canada on 3rd, March and it took us about a week to settle in, thanks God.
 
*We arrived in Canada on 3rd, March and it took us about a week to settle in, thanks God.
 
*We started our work full load on 11th, March. We had two remaining things to do; first, to implement the smooth handover part of the fault tolerance algorithm. We have done it. Second, to fine tune the settling time of the system with the delay compensator. We have done as much as we can in this, but still the settling time is longer than that in the transaction paper.
 
*We started our work full load on 11th, March. We had two remaining things to do; first, to implement the smooth handover part of the fault tolerance algorithm. We have done it. Second, to fine tune the settling time of the system with the delay compensator. We have done as much as we can in this, but still the settling time is longer than that in the transaction paper.
 +
 +
=== March 20  ===
 +
*We had a brief meeting with Dr. Tamir and showed him the results of the delay compensator and the fault tolerance implementations. They were fine. The only drawback is the ripples that appears in the response of the system with the delay compensator for the high delay values. 
 +
*We are now working on finding a new physical system for our work. We discussed the criteria of choosing such system with Dr. Tamir. Besides, we also search for an open source SCADA/HMI for our system.

Revision as of 19:51, 22 March 2015

Spring 2015 (Intern)

  • Courses: None
  • Submissions: None


March 13

  • We arrived in Canada on 3rd, March and it took us about a week to settle in, thanks God.
  • We started our work full load on 11th, March. We had two remaining things to do; first, to implement the smooth handover part of the fault tolerance algorithm. We have done it. Second, to fine tune the settling time of the system with the delay compensator. We have done as much as we can in this, but still the settling time is longer than that in the transaction paper.

March 20

  • We had a brief meeting with Dr. Tamir and showed him the results of the delay compensator and the fault tolerance implementations. They were fine. The only drawback is the ripples that appears in the response of the system with the delay compensator for the high delay values.
  • We are now working on finding a new physical system for our work. We discussed the criteria of choosing such system with Dr. Tamir. Besides, we also search for an open source SCADA/HMI for our system.