Difference between revisions of "Private: mobile tv meeting minutes"

From NMSL
(No difference)

Revision as of 19:17, 1 October 2008

Sep 26th, 2008

  • Time: 4:00pm - 5:00pm
  • Attendees: Yi, Cong, and Cheng
  • Done:
    1. Cong has implemented the front-end UI, which enables users to configure broadcast channels. The configurations are stored as database files, which will be read by back-end scripts.
    2. Yi has implemented a perl script to generate psi/si table based on the database files. However, we haven't integrated Yi's script with other subsystems (including Cong's front-end UI and FATCAPS utilities).
    3. We have fixed the INT table in psi/si.
    4. We have done ESG bootstrap and fragment transport following the IPDC ESG standard. This is validated using Divicatch analyzer. However, we still fail to deliver SDP files.
    5. We have composed minimal ESG files for both IPDC and OMA BCAST ESGs. The IPDC version is working (except SDP file delivery). We are currently validating the OMA BCAST version.
  • Todo:
    1. Yi will start setting up the N810 tablet.
    2. Cong will complete use cases analysis by Wed.
    3. Yi will then document the low-level testbed design based on Cong's analysis by Thur.
    4. Cheng will fix the ESG.
    5. We hope to have the demo ready by our next meeting on Oct 3rd, 2008.

Sep 19th, 2008

  • Time: 3:00pm - 4:20pm
  • Attendees: Yi, Cong, and Cheng
  • Done:
    1. Yi showed us his testbed setup, and demonstrated file transfers using flute (over DVB-H).
    2. Cong has designed the web GUI design for the program table.
    3. Yi has got an initial script to generate ESG and psi/si tables based on the program table.
  • Todo:
    1. Cong will finalize the database implementation by mid of the coming week.
    2. Yi will develop a python (or perl) script, which interfaces with Cong's database and generate ESG as well as psi/si table at run time. This will be done by the coming Wednesday.
  • Risk items: The following problems need to be addressed (in this order) for playing video on N96 cell phone:
    1. INT content (which is a psi/si table) is missing.
    2. ESG bootstrap is not working yet.
    3. Transport (main) ESG is not working yet.